Royal North Shore Hospital Car Park Barrier Project

The $1.127 billion Royal North Shore Hospital (RNSH) and Community Health Services Redevelopment is an award-winning demonstration of expert construction management. Undertaken by Thiess, the works include a new 7-level multi-storey, 567-space car park covering 23,000m2.

More than 1400 lineal metres of the RhinoStop® car park barrier was installed along the perimeter, split-level and ramp locations. At the perimeter locations, RhinoStop guardrail was configured with coloured perforated panels, providing an integrated barrier and balustrade system. Standard mesh infill panels were used at the split-level locations.

Features

  • Construction by Thiess
  • 7 levels of car parking
  • Perimeter edge and split-level protection.
  • 1,400m of RhinoStop Type 4 guardrail
  • Perimeter edge configured with perforated infill panels and 1.3m handrail
  • Split levels configured with mesh infill and 1.1m handrail
  • RhinoStop Sky-Edge guardrail on entry ramp
  • Compliant to AS/NZS 2890.1: Parking Facilities – Off-Street Car Parking.
  • Compliant to the 30kN impact load described in AS/NZS 1170.1: Structural Design Actions.